X:1
T:Coiling Cables By The Roadside
C:Stephanelli (1st June 2015)
M:6/8
R:jig
L:1/8
K:C
|: "Am" CEG AEA | "G"GBG AEA | "Am" CEG ABc | "C"ecG "F"AEA|
"Am"CEG AeA | "G"dGc BGA | "C"CEG "F"AGA | "G"AGB "C"c3:|
|: "Am" ece dcB | "Em" eBe fga | "C" ece dcB |"Am" ecG AEA |
"Am" ece dcd | "Em" eBe fga | "Em" bge "F" afc | "G" gdB "C" c3:|

Ahhh, May Week.  Inspired by a post-May-Ball-gig session (at some ridiculous hour of morning - 5am possibly) of coiling some cables on the roadside while sorting out the kit for the next May Ball gig.